Building since 1991. Sevim Mühendislik has 35 years of experience.

Weekdays 09:00 – 17:30 (local time)
Follow us:
TR EN
Sevim Mühendislik
Energy

Power transmission line construction and revision

We execute assembly, revision, line renewal, and commissioning for transmission systems with schedule-focused delivery. Engineering validation, field coordination, and quality checks are managed in one workflow to reduce time and cost variance.

For new line builds and reinforcement projects, we integrate survey, execution, and acceptance into a single delivery model. A field quality plan covers critical steps such as foundation works, conductor stringing, and insulator/accessory installation. In revision scopes, operational constraints are considered to minimize outage impact and phased transition plans are applied. During commissioning, electrical tests, mechanical verifications, and acceptance documentation are completed for safe handover.

Frequently Asked Questions

TEIAS/EDAS technical specs, current regulations, and safety procedures are applied together.

Each execution step is tracked with inspection plans, field records, and photo-based verification.

Electrical tests, mechanical checks, function validation, and acceptance reporting are completed in sequence.

A phased plan is coordinated with operations, including alternatives for critical loads.

Supply documents, certificates, and field acceptance controls are used to confirm compliance.